A flagship building contributing to the future vision of Nathan campus

To accommodate staff and students relocating from Mount Gravatt campus, a new 22,000sqm nine storey building will be developed. N82 will be a flagship building contributing to the future vision of the Nathan campus to create a lively and engaging campus that embodies Griffith’s core principles and values.

The new building is being developed primarily to accommodate AEL and Health staff and students from Mount Gravatt campus, which will close Q1 2026.

11 Sustainable cities and communities

Sustainable Development Goals

Griffith University is aligned with the United Nation’s Sustainable Development Goals (SDGs) and is committed to contributing to a sustainable future, protecting our planet’s ecosystems, and ensuring a liveable environment for present and future generations.

Building design

The main design feature of the building is the introduction of a central outdoor atrium formed by a series of elevated terraces opening onto Johnson’s Place.

The ground level of the building will include a café, a Changing Places facility, GU exhibition space for display of research and engagement with industry, formal and informal teaching spaces and lounge spaces for students, staff and the public/ or visitors to our campus.

The remainder of the building will integrate teaching spaces with research and staff accommodation encouraging cross-collaboration and engagement.

Project status

  • Architect and Lead Designer BVN appointed via Design Competition
  • Design team procurement completed by Griffith in consultation with the Lead Designer
  • Stakeholder engagement commenced in July 2021
  • Concept design was approved by University Council in December 2021
  • Schematic design commenced in January 2022 and completed in July 2022
  • Head Contractor procurement is nearing completiion with an announcment imminent
  • Demolition of N13 is set to commence in the  coming months
  • Construction of N82 is set to commence early 2024

Science enabling works

For N82 to be built, the current occupants and equipment in the Environment 2 (N13) building (the proposed site for N82) need to be accommodated elsewhere. These works include:

  • Refurbishments in Engineering, Technology & Aviation (N79), Science 2 (N34), Technology (N44), and Environment 1 (N55)
  • Development of a Technical Annex (N81) on current site of the Central Chiller Plant (N45) is underway
  • Development of a new chiller plant (N80) is complete

This project is targeting a five-star Green Star Buildings v1 rating

Take a virtual tour of N82

Detailed design planning is still underway for N82, however BVN Architecture have developed a 'work in progress' fly-through animation which tours some of the highlighted design elements.

Want to get involved?

Simply email to join our staff online consultation group

Project Timeline

Several projects are underway or planned for Nathan campus. These projects have been sequenced based on priority and preparatory requirements for the N82- New Arrivals Building. Demolition of N13 is set to commence in the coming months with construction on N82 is set to start in early 2024, for completion in 2026, and teaching from early 2026. This infographic provides an overview of the project’s timeframes.

Graphical depiction of key project milestones

Frequently Asked Questions

How is N82 being developed?

How is N82 being designed?

Why is Griffith investing in new buildings at this time?

Will there be opportunities to contribute to the design of the building?

N82 Fact Sheet